Contracts

Project:- supply and stacking of 50 mm guage Machine Crushed ballast at rajahmundry Railway Depot and loading into Railway Wagons

Client:- South Central Railway GM/W/SC/94/3 Dt.30-12-1994 & 98/I/Rjy

Remarks:-Supplies produced ass per schedule

Project:- supply and stacking of 50 mm guage Machine Crushed ballast at Gunji Railway Depot and loading into Railway Wagons

Client:- South Central Railway GM/W/SX/96/3 dt.26-7-96

Project:-Design and construction of 38 spans of 18.30 m PSC Superstructure.Strengthening of existing substructure by jacketing .Railway Bridge no 104 is located near Hospet across river Tungabadra.

Client:-South Central Railway No.496/H/2028//G.C/Dated 28-8-94

Remarks:-Works was completed 2 months ahead of schedule.
Project:- Construction of Aqueduct cum double lane road bridge across river Vynatheyam near Gannavaram, East Godavari Dist. 21.0m * 7.0m double D Well foundations, Sub structure & PSC Super Structure - Left Abutment and Pier No.1 to 16 etc, for 16 Spans

Client:- AP State Government Irrigation & CAD Projects. 3G&4G&6G/98-99 dt.8-5-98. & 7-12-98

Remarks:-Work was executed to the utmost satisfaction to the department.

Project:-Strengthening of substructure by jacketing and replacement of existing MG Steel griders with OUR OWN Designed PSC Superstructure in m between Golak road and Ghattaprabha in connection with Guage Conversion

Client:-South Central Railway No.47/CAO/C/SC/92/ Dated 6-4-94

Project:- Guage Conversion of Aurangabad - jalna section.Strengthening of substructure by jacketing of Railway Bridge no 184 as 4X18.30m spans and replaacement of existing bed blocks and steel griders with OUR OWN DESIGNED Bed blocks and PSC Superstructure.

Client:-South Central Railway No15/CAO/C/SC/Dated-13-10-92

Remarks:- Work was completed 1 month ahead of schedule.
Project:-Guage Conversion of Parbhai -Parli section.Strengthening of substructure of Railway Bridge no.28 across river Godavari near Gangakher ,as 15X18.30m spans and replaacement of existing bed blocks and steel griders with OUR OWN DESIGNED PSC Superstructure.

Client:- South Central Railway No.39/CAO/C/SC/Dated-15-6-92

Remarks:-Railway handed over the bridge for the final vlock with more than 1 month delay.

Project:-Construction of 3 major Major RAilway Bridges between Kasal-Vaibhavawadi in KRCL project across river Kasal,Gad,Janoli.,consisting of open foundations RCC/MASS concrete substructure and bed blocks with 32 X 12.20m spans of PSC Superstructure.

Client:-Konkan Railway Corporation No.KR/KD/W/C/17/91/ Dated-26-4-91

Remarks:-6 months delay was due to non - finalisation of drawings by KRCL for the 12.20m spans.
Project:- Design,Construction of new BG Railway Bridge of 6 x 18.0m spans.Pile foundations,RCC circular piers & PSC superstructure, across Narmada main canal between Timba-Tuwa stations.

Client:- Western Railway C&S/677/Dated 16-5-91

Project:-Permanent Restoration of Cyclone damaged Ralway Bridge No.126 by rebuilding Piers,returns etc., on VZY- Waltair Section under running traffic conditions.

Client:- South Central Railway No.GM/W/90/4 Dt.27-6-90

Remarks:-Emergency Bridge completed 1month ahead of schedule