project:-Design and constructionof Railway Bridge No.19 across river Gimma Vagu with 2 spans of 17.92m and 4 Spans of 18.12m PSC Super structure.

Client:-South Central Railway No.35/CAO/R/C/SC/90 Dated 25-4-90.

project:-Permanent Restoration of cyclone damaged Railway Bridge No.608 by rebuilding abutment, wings, returns etc., and jacketing the piers on Samarlakot-Waltair section.

Client:-South Central Railway No.GM/W/90/8/ Dt.27-6-90

Remarks:-This is an Emergency Bridge completed within time
project:-Design and Construction of Railway Bridge across river Penganga near Adilabad as 23 x 20.0m spans.Open & well foundation, RCC circular piers and PSC Girders with deck slab.

Client:-South Central Railway No.84/CE/C/SC/88/ Dated 19-12-88

Remarks:-Delay was due to heavy rains & floods
project:-Design and construction of Railway Bridge No.38 with well foundations,substructure near Kurukunta with 3 spans of 17.4m and 2 spans of 18.16m PSC super structure.

Client:-South Central Railway No.19/CAO/T/CN/SC/1989 Dated 12-04-89.

project:-Rebuliding of Railway Bridge No.7B as ROB with 1*20.0m spans,PSC superstructure Between Hyderabad-kairtabad railway station for 4 lane road traffic.

Client:-south Central Railway NO.W/CON/1361 DT-28-7-89

project:-Designed and construction of Railway bridge NO.39 with well foundation across lyyala river near kurukunta with 12 spans of 18.0m PSC Griders and decking.

Client:-south Central Railway NO.49/CE/C/SC/1988 DT-14-7-88
project:-Designed and construction of SanatNagar-Moulali RUB Bridge with 6m dia well foundation,RCC Circular Piers,via ducts with 4 spans of 18.67m and 2 spans of 11.65m with PSC super structure.

Client:-south Central Railway NO.18/CE/C/SC/1987 DT-28-2-8515-7-87
Remarks:-This is an emergency Bridge an awarded to us on a single tender Basis and work was completed on schedule.
project:-Construction of Tunnels,Major Bridge,Earthwork,Protection works and misc,works in section-KR53 on Koraput-Raygada Railway BG line project

Client:-south Central Railway


project:-Construction of Railway Bridge with Open Foundation and substructure across Betwa river with 18*23m spans,earthwork in approaches in Bina-jhansi section.

Client:-central railway NO.COA/C/217/ DT-28-2-854-8-88
project:-const:of 150 m length aqdditional Tunnel ,earth work cutting in approaches near panchpilia station on Dahod-Ratlam section on Rajadhani route between Bombay and Delhi.

Client:-Western railway NO.C AND S/603/ DT-25-2-88

Remarks:- GM Cash Award Received for having completed the tunnel 4 months ahead of schedule.